
Whitwick LE67 · Gravel Driveways
Planning a project in Whitwick? Tell us what you have in mind and we will come back to you with a free, no-obligation quote.
"*" indicates required fields
We lay gravel driveways in Whitwick for homes around the Market Place and on the steeper roads towards Charnwood. Whitwick's ground is firm and often rocky, but slopes are common, and loose gravel washes downhill. Our driveway installation digs out, compacts the sub-base, lays a membrane and fixes edging, with grids on sloping drives and a drainage channel at the bottom.
Whitwick calls are mostly about steep drives, gravel on the pavement and old surfaces that need digging out. Many Whitwick homes sit above the road, so the drive has to climb. Grids are often the answer.
Reviews from local homeowners.
Fully insured · All work guaranteed · No obligation
We will compare the options on your free site survey.
Book a free surveyPlanned first.
Stone samples.
Machine compacted.
Tidy edges.
A proper base.
Big areas for less.
| Use | Stone | Why |
|---|---|---|
| Parking | Angular 14 to 20mm | Locks together |
| Paths | 10mm | Comfortable |
| Slopes | Gravel in grids | Stays put |
| Feature areas | Coloured chippings | Looks smart |

Whitwick drives usually suit gravel for these reasons.
Rock close to the surface in Whitwick means a firm base but a slower dig, priced at the survey. On steep drives, grids stop the stone migrating and a drainage channel catches run-off before it reaches the house.
If rock is shallow under your Whitwick drive, the quote says so.
Six steps.
Compare it with any other quote you get.
Gravel needs little upkeep. A few minutes now and then keeps it looking new.
Smooth out tyre tracks every few weeks.
A thin fresh layer every few years.
The membrane stops most from below.
Firm edging keeps stones in.
Whitwick quotes depend on how steep the drive is, rock near the surface and grids.















Yes. We lay gravel drives in Whitwick, including steep drives with grids.
It depends on area, slope and rock. Surveys are free. Phone 01530 251694.
Rocky ground needs little depth; steep drives need grids and a channel at the bottom.
Yes, with grids and a channel drain on the steeper roads.
Usually, yes.
Loose stones and ruts.
14 to 20mm for cars.
No. It needs a base.
Many years, with top-ups.
Rake, then add a thin layer.
Tell us about your drive. We will arrange a free site survey and send a written, itemised quote.
"*" indicates required fields
View other Templates